by 6P@dmin | Feb 20, 2024 | Projects
Chinook Industrial provides phone support for project planning and on-site service to complete the work. The tailshaft is the final connection to a ship’s propellor and should be protected from salt water corrosion. A properly applied glass-reinforced epoxy laminate...
by 6P@dmin | Feb 20, 2024 | Projects
Chinook Industrial and Five Star Products personnel provide technical support to contractors and steel mill engineers to aid in selection of best repair materials for high temperature repair. A Manitoba Steel Mill planned the rebuild of a high temperature furnace...
by 6P@dmin | Feb 20, 2024 | Home Page, Projects
Ongoing maintenance issues with OEM style compressor valves on multiple units at a key western Alberta site for a Canadian midstream oil and gas producer were causing excessive down-time and operator callouts. Additional design challenges included dirty sour gas...
by 6P@dmin | Feb 16, 2024 | Projects
A southeastern Alberta based petro-chemical plant required a solution during a site wide turnaround that would repurpose a decades old equipment concrete base for use with a new large-scale electric motor. The existing concrete foundation was capped with epoxy grout...
by 6P@dmin | Feb 16, 2024 | Projects
Chinook Industrial attends on-site review of project and with ITW Chockfast Engineering provide recommendations for product selection and project planning. The existing grout tying a barge crane to the turntable had failed due to overloading and required replacement....