Industrious Solutions

Featuring solutions for a wide array of industries, our team provides the best support that over 50 years’ experience can offer.

Span Support Segment Grout Placement on the Victoria Johnson Street Bridge

Industrious Solutions

Featuring solutions for a wide array of industries, our team provides the best support that over 50 years’ experience can offer.

Survey of Gas Facility

Industrious Solutions

Featuring solutions for a wide array of industries, our team provides the best support that over 50 years’ experience can offer.

Survey of Wind Turbines

5

Innovative Processes

5

Case Studies

Chinook works with great suppliers and offers exceptional materials to meet your maintenance requirements. The quality of our team members is second to none and they bring innovative ideas, and imaginative solutions to your most difficult problems based on factory training, field experience and shared ideas. When one of our people is on site, you get the best of all of us, offering more customized choices and solutions to the best customers in the world.

Over the years, Chinook has developed process paperwork to ensure that our work is done to the best of our ability each and every time. This includes key points that must be done on each process, an evaluation of how your equipment is set up and serves as a record of work completed on your equipment for future reference. These evaluations are all available for our customer records.

Industries supported by Chinook include:

  • Natural Gas Processing
  • Oil Refining, Petrochemical
  • Power Generation
  • Mining
  • Marine
  • Pulp and Paper Mills
  • Water Treatment Plants
  • Wind Turbines
  • Fans
  • Cooling Towers
  • Coker Drums
  • Heavy Industry
  • Off and On Road Trucking

Innovative Processes

  • Grout Installation ITP’s and Project Data Sheets ensure that your grouting project has been executed to our grouting best practices guidelines. Backup documentation for each project ensures your equipment record of work is accessible and accurate.
  • Lubrication Surveys provide a record of lubrication equipment installed on your unit with calculations completed to ensure correct volume of lubrication is recorded to each delivery point.
  • Lubrication Schematics complement the Lubrication Survey to offer a quick reference for all system components and settings that service your equipment. This listing includes a detailed bill of materials to ensure accurate replacement part orders.
  • The Compressor Valve Survey is Chinook’s way of ensuring your compressor is operating at best capacity. As the first step to fine tuning your compressor valves, we can ensure consistent gas flow and the best service life. Revisions to the compressor valve survey ensure an accurate, detailed account of any compressor valve setup changes. This documentation also allows for records on material trials and specific customer standing instructions. Combined with serialization of all Chinook manufactured and reconditioned compressor valves we can ensure effective operation of your equipment.

Call For a Quote:

(403) 253-8291

“The lunch & learn was well received and feedback was very positive.”

Burckhardt Compression

Case Studies

Five Star Mixing Instructions for Epoxy Grout

Five Star Mixing Instructions for Epoxy Grout

For optimum performance, all components should be conditioned to between 70°F and 80°F (21°C and 27°C) prior to use. Pour all Component B (hardener) into pail containing Component A (resin). Mix thoroughly by hand with a paddle or with a slow speed drill and paddle...

read more
Compressor Valves

Compressor Valves

Solved Compressor Valve Centre Bolt Breakage: Chronic centre bolt breakage occurring in first-stage compression on a pair of Gemini compressors critical to natural gas compression operations for a central Alberta production company. Third party investigation...

read more
Automated Lubrication

Automated Lubrication

Saved $50,000.00 per year in Oil Costs: A Lube Survey was completed for a SE Alberta gas processor which identified their lubrication system was over-lubing their compressor significantly. Chinook did a system tune-up that resulted in reduced lubrication of 92 barrels...

read more
Grouting and Chocking

Grouting and Chocking

Eliminated Vibration: An Oil Sands operator brought in Chinook to address a poor installation of nine sole plates. Our team determined the original plates had not been prepped properly, and the grout was not poured high enough to have full contact with the bottom of...

read more
Victoria Johnson Street Bridge

Victoria Johnson Street Bridge

Span Support Segment Grout Placement: Victoria’s Johnson Street Bridge is a draw-bridge providing clearance for boat traffic. It is Canada's largest single-leaf bascule bridge and is subject to nine million pounds loading. The responsible engineering firm in New...

read more
Propellor Shaft Coating

Propellor Shaft Coating

Chinook Industrial provides phone support for project planning and on-site service to complete the work. The tailshaft is the final connection to a ship’s propellor and should be protected from salt water corrosion. A properly applied glass-reinforced epoxy laminate...

read more
High Temperature Concrete Repair

High Temperature Concrete Repair

Chinook Industrial and Five Star Products personnel provide technical support to contractors and steel mill engineers to aid in selection of best repair materials for high temperature repair. A Manitoba Steel Mill planned the rebuild of a high temperature furnace...

read more
Improved Compressor Valve Reliability

Improved Compressor Valve Reliability

Ongoing maintenance issues with OEM style compressor valves on multiple units at a key western Alberta site for a Canadian midstream oil and gas producer were causing excessive down-time and operator callouts. Additional design challenges included dirty sour gas...

read more
32 Days On Site – Foundation Repair / Replacement

32 Days On Site – Foundation Repair / Replacement

A southeastern Alberta based petro-chemical plant required a solution during a site wide turnaround that would repurpose a decades old equipment concrete base for use with a new large-scale electric motor. The existing concrete foundation was capped with epoxy grout...

read more
Crane Turntable Grouting

Crane Turntable Grouting

Chinook Industrial attends on-site review of project and with ITW Chockfast Engineering provide recommendations for product selection and project planning. The existing grout tying a barge crane to the turntable had failed due to overloading and required replacement....

read more
”It was a pleasure to have Chinook with us for Chockfast on-site training. We’ve had a very positive reaction from everyone involved.”

Seaspan Marine Project, Vancouver Shipyards